SuperPM

SuperPMs build features in minutes.

Scenario

Want to add a simple ‘delete’ confirmation modal? Here’s what happens:

After using SuperPM
Three steps; PM validates early; engineer review and merge.

With SuperPM

  1. 1

    SuperPM creates feature in minutes.

  2. 2

    Tests instantly and realizes missing toast message so updates instantly.

  3. 3

    Engineer reviews submitted PR in GitHub and merges.

Time savings:~1 week
No context-switching for engineer
No surprises, accurate scoping
Before using SuperPM
Seven steps including a 4-day wait; rework; engineer context switch.

Without SuperPM

  1. 1

    Asks designer for mockup.

  2. 2

    First available engineer is 4 days away.

  3. 3

    Engineer completes task and grabs different task while PM tests.

  4. 4

    PM realizes they need a "Delete successful" toast message.

  5. 5

    Engineer reworks when they get a chance. PM tests again. Eng merges.

How it works

Enter the spec

Paste the spec or describe the change in plain language.

Spec Requirements

Add filter dropdown to table
Show empty state when no results
Ensure form is accessible

Ready to build features in minutes?

Join the waitlist and transform how your team ships features.